Cost KPIs are computed at report time from the collectors every run already keeps -- costing adds no new simulation logic, only new columns on existing result frames. job_shop_jackson.json is a worked example (costed resources, a WIP holding cost, and scenarios that change cost).

Resource cost

Set on a resource, in the model's currency (simulation.currency, default "EUR", label only -- never used in arithmetic):

Field Meaning
cost_busy Rate charged while the resource is busy, per cost_time_unit.
cost_idle Rate charged while the resource is scheduled but idle. Off-shift and failed time cost nothing (they are outside the scheduled window).
cost_per_use Flat charge per seize.
cost_time_unit Unit cost_busy/cost_idle are expressed per (default "hours"); converted against the model's base time unit.

Busy/idle/usage cost all come straight from the resource's existing busy-time and seize-count collectors -- see resource_summary's Busy Cost/Idle Cost/Usage Cost/Total Cost columns in the KPI reference.

Entity cost

Source When
Usage share At SEIZE/PROCESS, a share of the resource's per-use cost.
Holding cost At DISPOSE, holding_cost x (time in system since warm-up, whichever is later), from the entity type's declared holding_cost per model base time unit.
Model-assigned Anything a model itself adds, e.g. entity.cost = entity.cost + x in an ASSIGN block.

A currently-live entity's cost is projected at report time (busy/holding cost it would have accrued up to now); a completed entity's cost is exact, streamed at DISPOSE.

BATCH sums its members' cost into the batch entity; SEPARATE splits it back evenly across the children when the batch is split. A member currently absorbed into a batch entity is excluded from every cost sum (its cost lives in the batch entity, not double-counted).

Lump-sum and fixed costs

Everything above accrues as a rate. Three real costs are not rates, and each one has its own mechanism. All three join Total Cost and are itemised in the cost_summary frame (Run, Item, Category, Kind, Amount), one row each.

A cost per event: RECORD with kind="cost"

An ordering cost every time a replenishment is placed, a penalty per lost customer. Put a RECORD on the path the event takes and set:

Field Meaning
kind "cost" -- the one RECORD kind that builds no collector.
stat_name The cost item's name; its KPI key is cost/<name>/Amount.
expr The money amount added each time an entity passes: a constant, or an expression such as entity.scm_qty * penalty.
category Free-text grouping shown in cost_summary (ordering, penalty, capital).

An event cost is a statistic, so amounts charged before the warm-up reset are discarded with every other statistic.

A cost per changeover: PROCESS's setup_cost

A changeover is not a job, so a RECORD cannot price it: a RECORD sits on the path entities take and would charge every job that passes, whether or not the station actually changed over. PROCESS has its own field instead, beside the changeover TIME:

Field Meaning
setup_cost Money charged once per actual changeover, e.g. TABLE("Changeover cost", previous_key, key). previous_key and key are in scope here, exactly as in setup.
setup_cost_category The grouping in cost_summary; defaults to Changeover.

The item is named Changeover <block>, so two stations never share one line, and its KPI key is cost/Changeover <block>/Amount. It joins Total Cost and resets at warm-up like any other event cost. A changeover that takes no time but still costs scrap and a technician is charged all the same: the event is the changeover, not the delay it happens to need.

The count comes with it. Changeovers and Setup Time appear per block in the queue_summary frame (queue/<block>/Changeovers), beside balking, reneging and preemption -- the other things that happen to a block at its resource. A model with none of them still gets no rows there.

Manufacturing's Workstation asset exposes both as Changeover time and Changeover cost.

A fixed cost of the scenario: the fixed_costs section

A capex, or an annuity over a sized parameter, so an optimisation can trade capital against operating cost:

"fixed_costs": [
  {"name": "Battery capital", "category": "Capital",
   "amount": "battery_kwh * 450 * 0.09 * HORIZON / 8760"}
]

amount is a number or an expression over the model's variables and data, evaluated once at run start. It is never time-prorated by the engine: a fixed cost is the cost of having built the thing, and it counts in full however long the run is. When you want a share of an annuity, write that share yourself -- HORIZON is the run length that was asked for, in the model's base time unit, so amount * HORIZON / 8760 on an hourly model charges the run's share of a year and keeps capex and the operating cost on the same window.

Inside a submodel definition a fixed cost is named under scoped.fixed_costs, exactly like a flow: each instance gets its own copy, priced on its own parameters.

A peak charge: a flow's peak_price

A demand charge is peak imported power times a tariff. A flow already tracks the highest rate it actually held (Peak Rate); peak_price is a plain number, money per unit of that peak, billed once at the end of the run. A tariff that varies over time is a flow price, not a peak price.

Energy

A resource or fleet takes power, kW per unit, one number for each state it can be in:

{"name": "Press", "capacity": 2, "power": {"busy": 5.0, "idle": 1.0, "down": 0.3}}

busy, idle, down and off_shift default to 0kW; blocked defaults to busy (a blocked unit is still seized, holding a finished part). kWh per state comes straight from the busy/available/down time the resource already tracks -- no new collector. simulation.energy_price (money per kWh, evaluated once at run start) prices the total as cost kind "energy", joining Total Cost and cost_summary like any other cost. The energy_summary frame gives kWh per state, total kWh, average kW and energy cost, one row per resource (fleets included); it resets at warm-up like any other statistic and stays empty for a model with no power declared.

Material flow and bottlenecks

Every link a model draws is also counted: the material_flow_summary frame (From, To, Entities) is what svgcharts.sankey draws as the flow diagram in the report, showing where volume actually goes without reading a single number.

Bottleneck analysis is opt-in -- set top-level "outputs": {"bottleneck": true} -- because it tracks every resource's active/inactive intervals over the whole run (memory proportional to event count, not something to pay for by default). A resource is active while working, in a changeover or under repair, and inactive while idle, blocked or off shift; at each instant the resource with the longest current active period is the bottleneck. Roser's method then splits credit: Sole when it is the only one in its active period overlapping the next bottleneck's, Shifting when two periods overlap. bottleneck_summary reports Sole %, Shifting % and Total % per resource; the existing Bottleneck Score (queue-based) is unchanged and needs no opt-in.

System-level cost

System > Total Cost = total resource cost + total entity holding cost + the model-assigned-only portion of entity cost (never counts an entity's usage/holding share a second time on top of the resource side) + total flow cost + every cost_summary amount. Cost per Completed Entity divides that by completed entities.

Where it shows up

  • resource_summary and entity_summary/entity_log cost columns.
  • cost_summary: the fixed, event and peak items, one row each, EMPTY for a model that declares none -- so an existing model's frames are unchanged.
  • The report's Costs section and stacked bar chart, shown only when any cost is non-zero, with a "Fixed and lump-sum costs" table when there are any.
  • Scenario comparison and optimisation address a cost item as cost/<item>/Amount, like any other KPI key.