Dates and calendars

A model's clock is a plain number in the base time unit and always starts at 0. That is the right choice for an abstract study: "minute 4320" needs no timezone and no leap year.

It is the wrong choice when the study is about real weeks. A shift starts at 06:00 every Monday, a plant shuts for Christmas, a tariff is dated, and a client report should say "Wednesday 10:00", not "minute 4320". For that, give the model a calendar.

A calendar is optional. Without one nothing changes: the same numbers, the same results, the same exports. With one, the numbers stay exactly as they are -- the engine never learns about dates -- and everything that shows a time shows a real instant.

Setting one

Run > Run experiment..., tick Model runs on real dates, and pick a start instant and a timezone. In the model file:

"simulation": {
  "time_unit": "minutes",
  "calendar": {
    "start": "2026-01-05T08:00:00",   // the real instant model time 0 stands for
    "timezone": "Europe/Rome",        // IANA name; UTC by default
    "end": "2026-01-12T08:00:00"      // optional: a run END DATE instead of a length
  }
}

start written without an offset is read in timezone -- "08:00 at the plant", which is what a planner means. Written with one (2026-01-05T07:00:00Z, ...+01:00) the offset wins. It is never read in the machine's local time, so the same file runs identically on a laptop in Rome and on a build server in UTC.

end, when you give it, replaces simulation.time_limit: the run length becomes the distance from start to end.

On the command line:

naga run model.json --start 2026-01-05T08:00:00 --timezone Europe/Rome --until 2026-01-12T08:00:00

Weekday schedules

With a calendar, a capacity or arrival schedule can be written the way a roster is written: days of the week and wall-clock bands, instead of a list of durations.

{
  "name": "agent_shifts", "kind": "capacity", "time_unit": "hours",
  "off_value": 0,
  "weekly": {
    "mon": [["08:00", "12:00", 4], ["12:00", "16:00", 5]],
    "tue": [["08:00", "16:00", 4]],
    "sat": [["08:00", "12:00", 2]]
  },
  "exceptions": [
    {"start": "2026-12-24", "end": "2026-12-26", "value": 0, "description": "Christmas"}
  ]
}
  • A day with no entry, and any hour outside every band, takes off_value (0 by default).
  • Bands run forwards within one day; a night shift is two bands (22:00-24:00 and 00:00-06:00 the next day).
  • exceptions override whole local days, end inclusive, last match wins -- holidays and shutdowns. Give value to run reduced rather than closed.
  • For an "arrival" schedule the band value is a rate per the entry's time_unit, exactly as a points schedule's is.
  • repeat does not apply: a weekday grid repeats by the calendar.

Wall clock, not elapsed time

A weekday schedule means local wall-clock time. A 06:00 shift starts at 06:00 local on both sides of a daylight-saving change -- which is what a plant means, and is why the transition day is simply 23 or 25 hours long in model time. Elapsed-time arithmetic (a duration, a service time, the run length) is plain absolute time and never shifts.

It costs nothing at run time

A weekday grid is compiled once per run, over the run horizon, into the same piecewise-constant [duration, value] points the engine has always evaluated. No datetime arithmetic ever happens during a run, and a model without a calendar never touches any of this.

A run with no horizon at all compiles 52 weeks ahead; past that the last value holds.

Precedence over schedule_offset

A warm start's initial_state.schedule_offset says how far into its own cycle a points schedule already is. A weekday schedule is absolute in calendar terms, so the offset does not apply to it -- move the calendar start instead. Points schedules and repeating time series keep honouring the offset exactly as before.

Dated time series

A timeseries_inputs entry can carry real instants instead of numbers:

{"name": "tariff", "timestamps": ["2026-01-05T00:00:00", "2026-01-05T08:00:00"],
 "values": [0.15, 0.31], "beyond": "repeat", "period": "daily"}
  • timestamps replaces times (irregular shape); an ISO start with a step replaces a numeric start (regular shape).
  • period may be "daily", "weekly" or "yearly" instead of a number.
  • Everything is converted to model time once, when the model is built.

Dated orders, due dates and warm start

Anywhere an absolute model time is accepted, a calendar model also accepts an ISO timestamp:

"orders": [{"id": "WO-1001", "release": "2026-01-05T08:00:00",
            "due": "2026-01-06T14:30:00", "quantity": 2}],
"initial_state": {"resources": {"Scanner": {"down_until": "2026-01-05T09:30:00"}}}

Durations (age, remaining, a service time) stay numbers: they are lengths, not instants.

What you get back

Where With a calendar
Report header a Calendar row: the run's real window and its timezone
Report and results charts date axes -- hours, days, weeks, months or years, picked from the span
Playback clock Mon 05 Jan 08:30 instead of t = 30.0
Excel export a real datetime column beside every time column, with a date format
CSV and JSON export the same wall-clock column
MES twin unchanged: a sync sets the model start to the snapshot instant

The result frames themselves stay numeric, so a golden hash, a KPI and a scenario comparison are identical whether or not the model is dated. The wall-clock columns are added on the way out.

Validation

Code Meaning
E_CALENDAR_START no start instant, or it is not ISO 8601
E_CALENDAR_TIMEZONE the timezone is not an IANA name
E_CALENDAR_DATE a field written as a date is not an ISO date or timestamp
E_SCHEDULE_NO_CALENDAR a weekday schedule, but the model has no calendar
E_SCHEDULE_WEEKLY unknown day, malformed band, or overlapping bands
E_SCHEDULE_EXCEPTION an exception has no start date, or an inverted range
W_SCHEDULE_EXCEPTION_UNUSED an exception falls entirely outside the run
E_SERIES_NO_CALENDAR a dated series, but the model has no calendar
W_SERIES_BEFORE_START a dated series starts before, or ends after, the run window

Worked examples

  • the bundled model call_centre_day -- weekday opening hours, a Saturday morning and a dated holiday.
  • the bundled model biogas_plant_library -- a maize campaign in real autumn weeks, dated spreading windows and a weekly power price.
  • the bundled model energy_site_library -- a dated week with daily profiles.